|
|||
EGCE 553 - Cost Estimating and Bidding Strategy (3)Management and cost control of large capital projects. Capital cost estimation, value prediction and control, cost and schedule control and management of mega projects. Prerequisite: EGCE 350 or Civil Engineering graduate standing. Graduate-level Typically Offered: Fall |
|||
All catalogs © 2024 California State University Fullerton. Powered by Modern Campus Catalog™.
|